Guide · Ocean

What is CE Mercante.

CE Mercante is the electronic version of the ocean bill of lading, registered in the Mercante System. See the CE types, who files each one, the deadlines, what happens when it's late, and how it relates to AFRMM.

GuideUpdated

Short answer: CE Mercante, or electronic bill of lading (conhecimento eletrônico), is the electronic declaration of an ocean bill of lading's data. It's registered in the Mercante System, and Receita Federal carries out customs control on it in Siscomex Carga (IN RFB 800/2007). Each bill of lading becomes a CE. The ocean carrier files the master's, and the deconsolidating freight forwarder files a house CE for each house, up to 48 hours before the vessel arrives. The freight filed on the CE is the basis for AFRMM.

CE types

CE type Bill of lading, under IN RFB 800/2007 Filed by
BL single: a direct shipment, with no consolidation the shipping line or the shipping agency
MBL generic: the master, consigned to a deconsolidator the shipping line or the shipping agency
HBL aggregated (agregado), also called house or filhote the deconsolidating freight forwarder, consignee on the master CE
MHBL the co-loader's, which counts as generic in a multiple consolidation the deconsolidating freight forwarder

When adding a house CE, the deconsolidating agent enters the number of the master CE it belongs to.

What the CE reports

  • The bill of lading data: the parties, the ports, and the cargo items, such as containers and loose cargo.
  • Freight: the amount, the currency, and the payment type, prepaid or collect.
  • Freight components, such as THC, terminal handling (capatazia), and BAF. The Mercante manual asks for every charge on the bill of lading to be entered.

Deadlines

  • The import CE: the manifest and the CEs must be filed 48 hours before the vessel arrives.
  • Deconsolidation: must be completed, with every house CE, 48 hours before the vessel arrives at the master's destination port (art. 22, III).
  • Exception routes: on some routes, the deadlines are shorter.

The details are in the house CE deadline guide.

Amending and correcting

The forwarder can amend the house CE in the system itself until berthing at the final destination port. After that, only through an amendment reviewed by Receita Federal, requested by whoever entered the CE (arts. 27-A and 27-B). Changing the freight after an AFRMM event creates a hold if the cargo hasn't been delivered yet, or a review if it has.

When the CE is late

  • The fine: failing to provide the information in the required form and on time carries a R$ 5,000 fine for the freight forwarder (Decree-Law 37/1966, art. 107, IV, “e”).
  • The record: the system tracks deadlines and logs violations, which become electronic assessment notices (IN RFB 800/2007, arts. 44-D and 44-E).

The CE and AFRMM

The Mercante System calculates the AFRMM on each CE from the freight filed on it, and charges the Mercante Usage Fee of R$ 20 per CE along with it. The taxpayer is the consignee on the bill of lading, not the freight forwarder. See the AFRMM guide.

What about air?

CE Mercante is for ocean freight. In air freight, the air waybills, the airline's MAWB and the freight forwarder's HAWBs, go to CCT on Portal Único, in the XFWB, XFZB, and XFHL messages. See the guide what is air CCT.

How CloudComex helps

In CloudComex, the house CE number stays in the shipment file, and the deadline is calculated in each one from the vessel's estimated arrival. Operations files the house CE in Mercante using the data already in the shipment file. See CE Mercante and CCT in CloudComex.

FAQ

What does CE mean in Mercante?

It's the conhecimento eletrônico, the electronic bill of lading: the electronic declaration of an ocean bill of lading's data, registered in the Mercante System (IN RFB 800/2007, art. 2).

Who files the house CE?

The deconsolidating freight forwarder, which is the consignee on the master CE, or its representative. The master CE is filed by the shipping line or the shipping agency.

What is the house CE deadline?

Deconsolidation, with every house CE, must be completed 48 hours before the vessel arrives at the master's destination port (IN RFB 800/2007, art. 22, III).

Sources

See CloudComex at work in your operations.

In a demo with our team, you'll see quotes, shipment files, documents, and finance using examples from your day-to-day work, and get your questions answered on the spot.