Guide · Ocean imports

House CE deadline: 48 hours before the vessel arrives.

On ocean imports, deconsolidation must be completed 48 hours before the vessel reaches the master's destination port. See what the rule says, when the deadline is shorter, and what missing it costs.

GuideUpdated

Short answer: on ocean imports, the freight forwarder that deconsolidates the cargo must complete deconsolidation, with the house CEs filed in Siscomex Carga, up to 48 hours before the vessel arrives at the destination port of the generic bill of lading, the master. That's what art. 22, item III, of IN RFB 800/2007 says. On exception routes, the deadline is shorter.

Master CE, house CE, and deconsolidation

The electronic bill of lading (CE) is the electronic declaration of the bill of lading (B/L) data, filed with Receita Federal in Siscomex Carga, which the market calls Mercante. IN RFB 800/2007 classifies bills of lading by issuer and consignee:

  • Single (único): issued by the shipping line, when the consignee isn't a deconsolidator.
  • Generic (genérico) or master: when the consignee is a deconsolidator, such as the freight forwarder at destination.
  • Aggregated (agregado), house, or filhote: issued by a consolidator, when the consignee isn't a deconsolidator.

Deconsolidating means filing, under the master CE, a house CE for each house in the consolidation, and the freight forwarder does that at destination. The foreign consolidator, the NVOCC, is represented in Brazil by a freight forwarder (art. 3). And when a consolidator's house is consigned to another domestic deconsolidator, the co-loader, that bill is also treated as generic: the consolidation is multiple.

All the deadlines in art. 22

Filing Minimum deadline
Vessel and its port calls 5 days before the vessel arrives at the port
Manifests for foreign cargo to be discharged in Brazil, or remaining on board 48 hours before the vessel arrives
Deconsolidation completed: the house CEs 48 hours before the vessel arrives at the master CE's destination port
Manifests for foreign cargo loaded at a Brazilian port 18 hours before the vessel departs; 5 hours if all cargo is bulk

The vessel deadline drops to 5 hours when the ship carries no goods subject to manifest, only has manifests to load, or makes an emergency call (§ 4, as amended by IN RFB 2.044/2021).

Exception routes

The deadlines in art. 22 are minimums and can be shorter on exception routes, such as those departing from nearby ports. The General Coordination of Customs Administration (Coana) registers these routes and deadlines in Siscomex Carga, at the request of the Receita Federal unit with jurisdiction over the port, in proportion to how close the port of origin is. Each port's deadlines can be looked up in the system (art. 22, §§ 1 to 3).

The fine

Failing to provide cargo information in the form and within the deadline set by Receita Federal costs R$ 5,000.00, and the fine applies to the freight forwarder: that's art. 107, item IV, subitem “e”, of Decree-Law 37/1966, as amended by Law 10.833/2003.

How not to miss the deadline

  • Track the ETA at the master's destination port, not just the shipping date. The deadline moves with the vessel's arrival, and carrier notices and the origin agent's pre-alert bring the changes.
  • Ask the origin agent for the draft HBL early, before the vessel sails, and check consignee, packages, weight, and cubic measurement against the invoice and packing list.
  • Resolve discrepancies between documents before filing the CE, not after.
  • Split deadlines by owner. With several vessels arriving the same week, the risk is in the shipment file nobody is watching.

How CloudComex helps

CloudComex calculates the house CE deadline in every shipment file from the vessel's estimated arrival at the master's destination port and shows what's due first on Home. When the ETA changes, the deadline changes with it. See how it works in CE Mercante and CCT in CloudComex.

FAQ

Does the deadline run from berthing or from the vessel's arrival?

IN RFB 800/2007 refers to the vessel's arrival at the destination port of the generic bill of lading, the master. In practice, the freight forwarder tracks that port's ETA and completes deconsolidation before the 48 hours.

Who files the master CE and who files the house CE?

The master CE, the generic bill of lading, is filed by the shipping line, because its consignee is a deconsolidator. House CEs, the aggregated (filhote) bills, are filed by the freight forwarder that deconsolidates the cargo at destination.

Are there deadlines shorter than 48 hours?

Yes. For exception routes, Coana sets shorter deadlines in Siscomex Carga, at the request of the port's Receita Federal unit and in proportion to how close the port of origin is (art. 22, §§ 1 to 3). Each port's deadlines can be looked up in the system.

What's the fine for missing the deadline?

R$ 5,000.00 for failing to provide cargo information in the form and within the deadline set by Receita Federal. The fine applies to the international carrier and to the freight forwarder (Decree-Law 37/1966, art. 107, IV, "e", as amended by Law 10.833/2003).

Sources

See CloudComex at work in your operations.

In a demo with our team, you'll see quotes, shipment files, documents, and finance using examples from your day-to-day work, and get your questions answered on the spot.